Fable 5 forced onto usage credits on Max plan before July 20 cutover, despite reset allowance at 0% Fable usage

Status Fixed / completed
Reported on v2.1.209
Maintainer reply None cached
Activity 1 comment · opened Jul 16, 2026 · closed Jul 16, 2026

Summary

I'm on the Max (20×) plan (~£200/mo). Claude Code is routing Fable 5 usage to prepaid usage credits even though:

  1. The documented cutover to usage-credits-only is July 20, 2026 — Fable is supposed to be included on paid plans through July 19.
  2. My weekly plan allowance reset on ~July 15, and the per-model Fable usage meter on the website reads 0%.

So I have full, unused, included Fable allowance on a Max plan and Code is still gating/charging Fable against usage credits.

Expected

Through July 19, 2026, Fable 5 is included on paid plans (up to 50% of weekly limits). With a freshly reset allowance and 0% Fable usage, Fable requests should draw from my Max plan — not usage credits.

Actual

  • Switching to Fable 5 in Claude Code shows "Draws from usage credits".
  • I received a "Fable requires usage credits" block.
  • Meanwhile the website's Fable plan meter shows 0% used after the weekly reset.

Credits are being demanded regardless of available Max-plan quota.

Related issues

This looks like the same class of bug as:

  • #65514 — Pro plan blocked despite 17% usage
  • #64398 — blocked, quota available, no workaround
  • #65283 — stuck on "Usage credits required" with allowance left

Environment

  • Claude Code: 2.1.209
  • Model pin: Opus 4.8 (1M context); issue occurs when switching to Fable 5
  • OS: macOS 26.5.2 (25F84)
  • Plan: Max (20×)

Impact

Paying for Max (20×) but Fable 5 is not being honored as included on the plan — it's being forced onto usage credits before the stated July 20 cutover, despite a reset allowance at 0% Fable usage.

Request

  1. Confirm whether this is the known usage-credits gating bug.
  2. Ensure Fable 5 draws from the Max plan allowance per the July 19 policy.
  3. Refund any usage credits consumed while included plan allowance was available.

View original on GitHub ↗

This issue has 1 comment on GitHub. Read the full discussion on GitHub ↗