Implement Stage-Based ETABS Multi-Model Concrete Analysis System
Resolved π¬ 2 comments Opened Jul 27, 2025 by aminghali Closed Nov 29, 2025
π Project Requirements
Implement a complete stage-based architecture for ETABS multi-model concrete analysis with delta_ns methodology.
π― Scope
- 9 Base Models: A5, A6, A7, B5, B6, B7, D5, D6, D7
- 40+ Building Variations: Custom concrete strengths per floor
- 2 Analysis Methods: Method C baseline vs Method C + delta_ns
- 6-Stage Pipeline: Input β Setup β Processing β Analysis β Results β Output
π Implementation Requirements
- Each stage must be 100-200 lines maximum
- Multi-agent audit after each stage completion
- Atomic commits for every change
- GitHub workflow 2025 strict compliance
- Utility functions extracted to common modules
π§ Technical Specifications
- Stage-based architecture with clear interfaces
- Comprehensive error handling and recovery
- Delta_ns calculation and SetOverwrite integration
- Database storage with SQLite optimization
- Report generation and data export capabilities
β Stage Breakdown
- [ ] Stage 1: Input Validation
- [ ] Stage 2: System Setup
- [ ] Stage 3: Model Processing
- [ ] Stage 4: Analysis Execution
- [ ] Stage 5: Results Analysis
- [ ] Stage 6: Output Generation
π§ͺ Multi-Agent Audit Criteria
Each stage requires approval from:
- ETABS API Expert: COM interface and API usage validation
- Structural Engineer: Engineering methodology and calculations
- Software Architect: Code quality and design patterns
- Quality Assurance: Testing and error handling validation
π Success Metrics
- All stages independently testable
- Comprehensive error handling
- Clear documentation and interfaces
- Production-ready code quality
- Complete delta_ns methodology implementation
This issue has 2 comments on GitHub. Read the full discussion on GitHub β