Implement Stage-Based ETABS Multi-Model Concrete Analysis System

Resolved πŸ’¬ 2 comments Opened Jul 27, 2025 by aminghali Closed Nov 29, 2025

πŸ“‹ Project Requirements

Implement a complete stage-based architecture for ETABS multi-model concrete analysis with delta_ns methodology.

🎯 Scope

  • 9 Base Models: A5, A6, A7, B5, B6, B7, D5, D6, D7
  • 40+ Building Variations: Custom concrete strengths per floor
  • 2 Analysis Methods: Method C baseline vs Method C + delta_ns
  • 6-Stage Pipeline: Input β†’ Setup β†’ Processing β†’ Analysis β†’ Results β†’ Output

πŸ“Š Implementation Requirements

  • Each stage must be 100-200 lines maximum
  • Multi-agent audit after each stage completion
  • Atomic commits for every change
  • GitHub workflow 2025 strict compliance
  • Utility functions extracted to common modules

πŸ”§ Technical Specifications

  • Stage-based architecture with clear interfaces
  • Comprehensive error handling and recovery
  • Delta_ns calculation and SetOverwrite integration
  • Database storage with SQLite optimization
  • Report generation and data export capabilities

βœ… Stage Breakdown

  • [ ] Stage 1: Input Validation
  • [ ] Stage 2: System Setup
  • [ ] Stage 3: Model Processing
  • [ ] Stage 4: Analysis Execution
  • [ ] Stage 5: Results Analysis
  • [ ] Stage 6: Output Generation

πŸ§ͺ Multi-Agent Audit Criteria

Each stage requires approval from:

  • ETABS API Expert: COM interface and API usage validation
  • Structural Engineer: Engineering methodology and calculations
  • Software Architect: Code quality and design patterns
  • Quality Assurance: Testing and error handling validation

πŸ“ˆ Success Metrics

  • All stages independently testable
  • Comprehensive error handling
  • Clear documentation and interfaces
  • Production-ready code quality
  • Complete delta_ns methodology implementation

View original on GitHub β†—

This issue has 2 comments on GitHub. Read the full discussion on GitHub β†—